Cruisers Forum
 


S/V Folie A Deux
Dinghy Stern
Dinghy Bow
Dinghy
Finished! (Except for a patch of floor)
Some trim and one fiddle left to install.
Cabinets installed, new counter top subsurface installed.  Sink cutout remains to be done.
Tank primed and installed
Subfloor installed, cabinets going in
Cabinetry installed, fastening almost complete
New tank in position
Hoisting the new tank aboard
New tank!
Tank removed, bedding foam visible
Foam removed, subfloor tabbing to hull ground off & sanded
Hoisting the tank out of its cocoon
Lagoon Pond
Forward cabinet removed, plywood underlayment removed
Tile removed from underlayment, sliders removed
Galley floor
Top of diesel tank, subfloor cut out
Intact Galley.  Sigh.
Original engine, fuel tank visible


All times are GMT -7. The time now is 07:19.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.