Cruisers Forum
 


Reply
  This discussion is proudly sponsored by:
Please support our sponsors and let them know you heard about their products on Cruisers Forums. Advertise Here
 
Thread Tools Search this Thread Rate Thread Display Modes
Old 18-12-2020, 13:03   #1
Registered User

Join Date: Nov 2020
Location: Upstate NY
Boat: Trojan F26 HT
Posts: 37
Images: 2
Advice Please

Here’s my schematic for my Trojan F26 as I convert the old girl over to solar and LFP battery bank for the house circuit. I’m keeping the engine battery FLA. The OEM set up has a central cable connected to the central post of the 1–2-All-Off battery switch. This cable also contains the output to the 12V distribution of all loads. The other charging sources, which I originally planned to dedicate to the LFP house bank, are Victron 100/30 MPPT solar controller and Victron IP67 120V/25A plug-in charger. I’m now thinking about connecting both of these charging sources (fused, of course) to the central post of the switch, which could allow me to charge either or both banks via solar or AC shore power. Underway, the 70A alternator will charge the FLA engine battery, but will this same power make either of the other 2 proposed chargers go “poof”?
Attached Thumbnails
Click image for larger version

Name:	E32D418B-75C0-47F8-97D2-2B6D475989B9.jpg
Views:	43
Size:	414.3 KB
ID:	228879  
Randy P is offline   Reply With Quote
Reply

Tags
Advice, lease


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Please please Help Perkins!! Ny-vern Engines and Propulsion Systems 21 18-10-2018 22:12
HELP! Me Learn a New Language. Please. Please, please UNCIVILIZED General Sailing Forum 93 14-05-2017 09:03
Crew Available: I have to sail please pick me I'm willing to do anything please! LilGilligan Crew Archives 3 24-09-2016 00:40
West Systems 407 Filler Question - Please, Please HELP! Amigo Construction, Maintenance & Refit 22 22-09-2009 05:24

Advertise Here


All times are GMT -7. The time now is 17:29.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.