Old 15-05-2020, 14:39   #1
Registered User
 
Wood's Avatar

Join Date: Feb 2016
Location: Portsmouth, NH
Boat: Bayliner, 4588, 45'
Posts: 207
Commissioning LiFePo4 - reality check

I placed my first order through Alibaba in mid-January........... Got lost. Placed 2nd order early April and will be arriving soon.

I originally expected to have some time to futz around with the cells before installation. I had hoped to load test individual cells to confirm the data provided. Now I just want to get them in.... But be smart about getting them commissioned.

These are eight 280AH EVE cells. Configuration will be 2P4S. When they arrive I expect they will be ~ 3.3v. Internal resistance appeared consistent around .13.

The control equipment will be installed when they arrive. I'm using the 123BMS gen 3 with separate load / charge buses.

My thought are to charge each individual cell to 3.65v with a hard stop, pair them up and put them to work the same day.

Is it that *simple* or am I missing something?

Thanks in advance.
__________________
Irony
4588 Bayliner
Portsmouth, NH
Wood is offline   Reply With Quote
Old 15-05-2020, 15:05   #2
Registered User

Join Date: Apr 2015
Posts: 191
Re: Commissioning LiFePo4 - reality check

Top and/or bottom balance...bottom balance takes more effort and you don’t want to go below the point of no return, so you need ‘ok’ gear. Top balance is generally easier and requires less precision (in theory).

The delay you experienced is why I went with battleborn. More money, but the unknown delay would have been un-fun.

Good luck. Love our LiFePO4.
two-rocks is offline   Reply With Quote
Old 15-05-2020, 15:05   #3
Registered User
 
Reefmagnet's Avatar

Join Date: May 2008
Location: puɐןsuǝǝnb 'ʎɐʞɔɐɯ
Boat: Nantucket Island 33
Posts: 4,865
Re: Commissioning LiFePo4 - reality check

I'm about to set up my batteries and have found this site very useful...


https://marinehowto.com/lifepo4-batteries-on-boats/


On the subject of top or bottom balance, it's top balancing that makes the most sense for house banks
Reefmagnet is offline   Reply With Quote
Old 15-05-2020, 15:10   #4
Registered User
 
Reefmagnet's Avatar

Join Date: May 2008
Location: puɐןsuǝǝnb 'ʎɐʞɔɐɯ
Boat: Nantucket Island 33
Posts: 4,865
Re: Commissioning LiFePo4 - reality check

Quote:
Originally Posted by two-rocks View Post
Top and/or bottom balance...bottom balance takes more effort and you don’t want to go below the point of no return, so you need ‘ok’ gear. Top balance is generally easier and requires less precision (in theory).

The delay you experienced is why I went with battleborn. More money, but the unknown delay would have been un-fun.

Good luck. Love our LiFePO4.

I ordered batteries in late January from China. Bit the bullet and actually purchased one of the highest priced options. China closed down industry for a month as a result of the virus, so orders were delayed. I got mine about 4 weeks late but the supplier advised the status regularly. I guess the trick is to buy from reputable sources.
Reefmagnet is offline   Reply With Quote
Old 15-05-2020, 15:14   #5
Registered User

Join Date: Apr 2015
Posts: 191
Re: Commissioning LiFePo4 - reality check

Except 4 weeks late would have been 4 weeks late. We have been using our boat since the shut down in the USA - and needed batteries. So I agree with the reputable source, but I left the source up to someone else who buys in bulk and ships a finished product.

It was not my first choice, but has worked very well.
two-rocks is offline   Reply With Quote
Old 15-05-2020, 15:26   #6
Registered User

Join Date: Apr 2017
Location: New Zealand
Boat: 31ft tank
Posts: 144
Re: Commissioning LiFePo4 - reality check

Quote:
Originally Posted by Wood View Post
I placed my first order through Alibaba in mid-January........... Got lost. Placed 2nd order early April and will be arriving soon.

I originally expected to have some time to futz around with the cells before installation. I had hoped to load test individual cells to confirm the data provided. Now I just want to get them in.... But be smart about getting them commissioned.

These are eight 280AH EVE cells. Configuration will be 2P4S. When they arrive I expect they will be ~ 3.3v. Internal resistance appeared consistent around .13.

The control equipment will be installed when they arrive. I'm using the 123BMS gen 3 with separate load / charge buses.

My thought are to charge each individual cell to 3.65v with a hard stop, pair them up and put them to work the same day.

Is it that *simple* or am I missing something?

Thanks in advance.
Wire them all together in series so you have one large 3.3v battery and charge to 3.65v for a top balence using a charger/power supply or adjustable battery charger like a skyRC b6ac. THe skyRC has a Lifepo4 setting and it will take a while as its only 6amps but will finish the charge automatically. You will get a much better top balance this way with series charge.
Cowpoos is offline   Reply With Quote
Old 15-05-2020, 17:37   #7
Registered User
 
Wood's Avatar

Join Date: Feb 2016
Location: Portsmouth, NH
Boat: Bayliner, 4588, 45'
Posts: 207
Re: Commissioning LiFePo4 - reality check

^^^
I think you mean wire them in parallel.

I've got a 30amp variable power supply and a BM with relay outputs for high and low voltage.
__________________
Irony
4588 Bayliner
Portsmouth, NH
Wood is offline   Reply With Quote
Old 15-05-2020, 18:12   #8
Marine Service Provider
 
Emmalina's Avatar

Join Date: Jan 2012
Location: Thailand
Boat: Herreshoff Caribbean 50
Posts: 1,110
Re: Commissioning LiFePo4 - reality check

I just put some active battery balancers from ebay on mine and all is good. Thay all arrived pretty even anyway.
__________________
Steve .. It was the last one that did this !
Emmalina is offline   Reply With Quote
Old 15-05-2020, 18:53   #9
Registered User

Join Date: Apr 2017
Location: New Zealand
Boat: 31ft tank
Posts: 144
Re: Commissioning LiFePo4 - reality check

Quote:
Originally Posted by Wood View Post
^^^
I think you mean wire them in parallel.
Yes... Haha 😂... Parallel! My bad
Cowpoos is offline   Reply With Quote
Old 18-05-2020, 03:46   #10
Registered User

Join Date: Jun 2007
Location: Western Caribbean
Boat: 48' Alu Cat
Posts: 218
Re: Commissioning LiFePo4 - reality check

My 8 new Winston 300A cells arrived!
All cells were within 3 mV around 3.328V.
Was great to deal with Julia Yu from Thundersky, and at US $4/A a good price.
Correspondence before ordering and after payment was exceptional. We incurred an additional $250 local transport cost due to Corona restrictions, which Julia offered to pay!
How is that for service from a Chinese company!
Seman is offline   Reply With Quote
Old 18-05-2020, 13:59   #11
Registered User

Join Date: Oct 2013
Posts: 287
Re: Commissioning LiFePo4 - reality check

Congratulations on your new batteries. I did what Cowpoos suggested. I put the cells in parallel and charged to 3,6ish. Then let them sit for a week (don’t know if that matters but I had the time) . After that I left them to be taken care by the bms.
Flod is offline   Reply With Quote
Old 07-06-2020, 17:22   #12
Registered User
 
NorthernMac's Avatar

Join Date: Mar 2019
Boat: A185F, Mystic 30’ Cutter
Posts: 705
Re: Commissioning LiFePo4 - reality check

Will these 4 put together for 12v drop in as easily as a battleborn?

What have you guys been seeing for a time between order and door in the US?
NorthernMac is offline   Reply With Quote
Old 07-06-2020, 18:07   #13
Registered User
 
Wood's Avatar

Join Date: Feb 2016
Location: Portsmouth, NH
Boat: Bayliner, 4588, 45'
Posts: 207
Re: Commissioning LiFePo4 - reality check

I ordered two sets of eight - 1st January 22nd, arrived April 20th. Second April 14th and just cleared US customs 6/5. Should have them mid week.

Not drop in. But much less expensive.
__________________
Irony
4588 Bayliner
Portsmouth, NH
Wood is offline   Reply With Quote
Old 07-06-2020, 18:24   #14
Registered User
 
NorthernMac's Avatar

Join Date: Mar 2019
Boat: A185F, Mystic 30’ Cutter
Posts: 705
Re: Commissioning LiFePo4 - reality check

Quote:
Originally Posted by Wood View Post
I ordered two sets of eight - 1st January 22nd, arrived April 20th. Second April 14th and just cleared US customs 6/5. Should have them mid week.

Not drop in. But much less expensive.
So almost 4mo?

What else would be needed to make it the same as a BB?
NorthernMac is offline   Reply With Quote
Old 07-06-2020, 20:35   #15
Registered User
 
Wood's Avatar

Join Date: Feb 2016
Location: Portsmouth, NH
Boat: Bayliner, 4588, 45'
Posts: 207
Re: Commissioning LiFePo4 - reality check

You have a bunch of reading to do It's all here in various threads and links. You should start here:

https://marinehowto.com/about/
__________________
Irony
4588 Bayliner
Portsmouth, NH
Wood is offline   Reply With Quote
Reply

Tags
lifepo4


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Can you give me a REALITY check on living aboard? floathome Liveaboard's Forum 15 12-02-2022 18:42
Reality Check for Sailboat Process for Newbie zehnmm Monohull Sailboats 14 03-09-2008 13:48
Diesel Gunk Reality Check Microship Engines and Propulsion Systems 14 17-07-2008 17:10

Advertise Here


All times are GMT -7. The time now is 06:01.


Google+
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Social Knowledge Networks
Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.

ShowCase vBulletin Plugins by Drive Thru Online, Inc.